Object Oriented Simulation For Improving Unloading And Loading Process

Authors

  • Fadillah Ramadhan Department of Industrial Engineering, Institut Teknologi Nasional (Itenas), Bandung - INDONESIA
  • Said M. Baisa Department of Industrial Engineering, Institut Teknologi Nasional (Itenas), Bandung - INDONESIA
  • Arif Imran Department of Industrial Engineering, Institut Teknologi Nasional (Itenas), Bandung - INDONESIA

Keywords:

Object Oriented Simulation, Unloading-Loading, Dwelling Time, Quay Gantry Crane

Abstract

The Unloading – loading process at Tanjung Priok port is a complex process. It still causes high dwellin time due to inaccurate quay gantry crane allocation, number of Trucks during the unloading – loading process and probabilistic elements such as Truck’s speed changed, Quay Gantry Crane’s speed changed and number of containers to be processed. To tackle the problem, in this paper an Object Oriented Simulation (OOS) is proposed. This method show characteristics and behavior from every class that influence the systems. Several scenarios are used. This paper illustrated the best scenario for unloading – loading container process.

References

Banks, J., 1998. Handbook of Simulation. Georgia Institute of Technology at Atlanta, Georgia.

Law, A., 2007. Simulation Modeling and Analysis. McGrawHill. Inc.

Notteboom, T., 2004. Container Shipping and Ports: An Overview. Review of Network Economics Vol.3, Issue 2.

Proses Bongkar Muat, available at: http://suhirnoo.blogspot.co.id/2012/08/sistem-operasipetikemas.html, accessed on September 04, 2017.

Rothenberg, J., 1989. Object Oriented Simulation: Where Do We Go From Here?. The RAND Corporation at Santa Monica.

Sugioko, A., Nathalia, C., and Hidayat, T. P., 2014. Planning A simulation Model For Loading Unloading Containers To Decrease The Cycle Time. Proceeding 7th International Seminar on Industrial Engineering and Management. Atma Jaya University at Jakarta.

Published

2017-11-01

Issue

Section

FoITIC 2017