Analisis Perhitungan Arus Setting Sistem Proteksi Arus lebih pada Generator Unit-3 PT. XYZ
Keywords:
Generator, Over Current, Operation Time, PLTP, Setting currentAbstract
There is a major problem of the power system, namely the existence of short-circuit current interference. Over current relay protects electrical installations against short circuit current disturbances. The purpose of this research is to obtain the setting value of the over current relay generator of XYZ. This paper analyzes mathematical calculations and compares with field test data to determine the setting current and operating time on the relay when under normal conditions or in a tripped state. Based on the discussion, the setting current of 3.64 A and relay operating time of 4 seconds are obtained. These results are in the standard setting range set by the factory, which is 2.5 A to 10 A and the relay operating time is 4 seconds. The results obtained prove that by using the applied OCR coordination system, it is able to overcome the short circuit current in the electrical power system.
AbstrakĀ
Terdapat suatu permasalahan utama dari sistem daya yaitu adanya gangguan arus hubung singkat. Over current relay memproteksi instalasi listrik terhadap gangguan arus hubung singkat. Tujuan penelitian ini untuk memperoleh nilai setting over current relay generator XYZ. Paper ini menganalisis perhitungan matematis dan membandingkan dengan data pengujian dilapangan untuk mengetahui arus setting dan waktu operasi pada rele Ketika dalam kondisi normal maupun dalam keadaan trip. Berdasarkan pembahasan maka didapat arus setting sebesar 3,64 A dan waktu operasi rele sebesar 4 detik. Hasil tersebut berada pada tap range standar setting yang telah ditetapkan oleh pabrik yaitu 2,5 A hingga 10 A dan waktu operasi rele yaitu 4 detik. Hasil yang didapat membuktikan bahwa dengan menggunakan sistem koordinasi OCR yang diterapkan, mampu mengatasi arus hubung singkat pada sistem daya listrik.